For builders
One handoff. Cabinets done.
The Complete Cabinet Package covers everything from your plans to the last door: design, homeowner selections, ordering, inspection and delivery. One team owns it, so cabinets stop coming back to you as calls and supply runs.
What’s included
Design and selections
- Free preliminary designs from your plans
- A design consultation built around your cabinet budget
- Showroom appointments with your homeowner, so you don’t have to be there
- Selections guided by your budget
- Clear proposals, with any upgrades priced before anyone commits
Verify and order
- Site verification before anything is ordered
- Design approvals in writing
- We place, track and manage the order
Inspect, deliver, install
- Every order goes through Jobsite Verified in our shop
- Delivered to your jobsite in the Cabinet Hauler, on your schedule
- Installation available, quoted separately for each job
Jobsite Verified
Issues get caught here, not by your crew.
Every order passes five checkpoints before it reaches your jobsite:
- The Blueprint Pull. We take the cabinet scope straight from your plans.
- The Line by Line. We check every line of the order against the approved design.
- The Field Walk. We measure your jobsite after rough framing, before anything is ordered.
- The Build Check. We inspect and assemble the cabinets in our shop.
- The Load Out. We count every piece and pad it before it goes into the Cabinet Hauler.
Why the Field Walk matters
This year, on an L-shaped kitchen, the main wall ended up on the wrong side of the chalk line during framing. That put it 3½” into the kitchen and shortened the sink wall by the same amount.
The Field Walk caught it. Before ordering, we swapped the corner base from a B33 to a B30 and adjusted the filler. Without it, the installers would have been on the phone, then waiting a couple of weeks for a new cabinet.
If something shows up damaged or wrong, we handle it before delivery day. Atlas replacement parts ship within 3 days of a damage claim.
Included with every package
Bid-Ready Allowance Sheet
A realistic cabinet number you can put in your bid without chasing a quote. It helps you win the job and protects your margin once the job starts.
Homeowner Handoff Packet
A Cabinet Care Guide, plus what’s normal for stained and painted finishes. The questions homeowners usually call their builder about get answered before they pick up the phone.
When you’ll hear from us
Handed off should mean finished. Here’s every time cabinets come back to you:
- At the start. You send plans and a budget.
- If a selection goes over. You decide whether we quote the homeowner directly or send them back to you. You issue the change order. See how one builder handles it →
- Before delivery. We confirm the date fits your schedule.
That’s it.
Your install or ours
Setting the cabinets yourself?
They arrive checked, counted and staged, so your crew installs in one pass.
Prefer we install?
We quote it separately for each job, and your crew moves on to the next build.
We won’t be the cheapest quote.
Our pricing runs in line with local lumberyards. What you’re paying for is the work that doesn’t come back to you: the selections you didn’t manage, the reorders you didn’t chase, and the lost production you didn’t have.
- Deposit: 100% on Atlas cabinets at order
- Cabinet warranty: Atlas Limited Lifetime Warranty
- Install warranty: 1 year on our workmanship, and we cover the labor on warranty replacements
- Installation: quoted separately for each job
Send your plans and budget. You’ll have a quote within 5 business days.
(866) 930-5551 · Mon–Fri, 9–5 · Builder FAQ →
